- Docs
- Product
- Roadmap
Roadmap¶
This roadmap is derived from the preserved B2B build spec's build order and reframed for the TyteRide rework. The original Trippp stage names and sequencing are preserved as provenance, but the TyteRide rework supersedes them where current docs define different scope, terminology, or surface boundaries.
1. Delivery Flow¶
flowchart LR
F[Foundation] --> B[Booking]
B --> L[Live]
L --> D[D2D]
D --> A[Analysis]
2. Stages¶
| Stage | Scope | Exit Criteria | Dependencies | TyteRide Supersession Note |
|---|---|---|---|---|
| 1. Foundation | Data model, CompanyScope and seed Company backfill, membership, Company codes, tiers with seat limits, suspension, i18n baseline, Fleet Dashboard shell. |
Core tenant/membership data model exists; Company scoping is enforced; tier seat limits and suspension rules are in place; i18n baseline and Fleet Dashboard shell are usable. | None. | Original stage name retained for provenance. TyteRide scope includes Front Views as a surface and self-serve onboarding with manual Platform Admin approval; billing remains invoice-only, no gateway. |
| 2. Booking | Enrollment flow in both apps, trip groups and car choice, optional deadlines, duplication, Driver accounts, extra cars, reviews, Passenger App cleanup (remove payments). | Passengers can enroll and be approved; Managers can create/duplicate trips and manage Driver accounts; Passengers can book without payment; extra cars and reviews are available. | Stage 1 Foundation. | Terminology is normalized to Passenger App, Driver App, Driver, Passenger, Manager, Company, and Fleet Dashboard. Passenger App must not expose payment, wallet, top-up, or split-payment UI. |
| 3. Live | GPS cadence, Company channel, Fleet Dashboard Live tab, Passenger live view, Driver status messages. | Driver GPS publishes during active trips; Company and trip real-time channels deliver live updates; Fleet Dashboard and Passenger App show live tracking; Driver status messages are visible. | Stage 2 Booking. | Real-time behavior must follow current TyteRide architecture/spec docs where they supersede preserved assumptions. |
| 4. D2D | Eligibility, booking points, route plan, secondary routes on all surfaces. | Eligible Passengers can set D2D pickup/drop-off points; detours are validated; route plans include main and secondary D2D legs; Driver App, Fleet Dashboard, and Passenger App render the plan. | Stage 3 Live. | D2D remains door-to-door routing for Passengers; any route-planning implementation details must align with current TyteRide specs. |
| 5. Analysis | AnalyzeTrip job and Fleet Dashboard views. |
Completed trips produce trip_analytics; Fleet Dashboard shows per-trip analysis with delay/stop/D2D detour breakdown and map overlay context. |
Stage 3 Live; D2D data available when applicable from Stage 4. | Analysis should distinguish D2D detour minutes from Driver-attributable delays, as preserved in the source spec. |
3. Cross-Stage Dependencies¶
- Foundation before all feature work: Company scoping, membership, tiers, and suspension are prerequisites for booking, live operations, D2D, and analysis.
- Booking before Live/D2D: Trips, bookings, manifests, and Driver/Passenger flows must exist before live tracking and D2D route plans can be meaningful.
- Live before full D2D visibility: D2D route plans depend on trip/live surfaces for operational use; analysis benefits from live/tracking data.
- D2D before complete Analysis attribution: D2D detour reporting is only fully meaningful after D2D is implemented.
4. Open Questions¶
- Stage naming in TyteRide planning: The preserved stage names are kept here for traceability; current TyteRide delivery planning may rename or regroup them.
- Front Views milestone: The preserved build order predates Front Views as a first-class surface; the exact stage where Front Views onboarding/pricing ships should be confirmed in current TyteRide specs.
- Platform Admin onboarding approval workflow: Self-serve onboarding with manual Platform Admin approval is superseded policy, but its detailed workflow and stage placement are not fully specified in the preserved build order.
- Release criteria ownership: Exit criteria here are product-oriented; technical acceptance tests and per-surface release gates should be defined in method/spec docs.